BUWOG Rathausstraße 1

Winner of the real estate prize FIABCI Prix d’Excellence in the category of ‘industry’

Instead of the so-called glass palace (built in 1980), a modern office and administration building was constructed. It fits perfectly into the architectural structures of the 19th century. The double-skin main facade provides the required sound insulation, the glass roof in the inner courtyard allows the foyer to be flooded with daylight.

Project details

  • Österreich - Wien
  • Auftrag

    Execution Planning, call for tenders, support for contract awarding, support for local construction supervision (ÖBA)

  • 2017 bis 2020
  • Facade surface: approx. 5.400m²
  • Facade budget: 8,3 Mio Euro

Beteiligte Unternehmen

Contracting entity: BUWOG AG
Architects: Atelier Heiss ZT GmbH
Local construction supervision (ÖBA): CONSPEED BAUMANAGEMENT GMBH
Executing metalworking company: STRABAG AG Metallica